Browse All Services

Dilapidation Surveys

Pre-construction condition assessment and documentation of existing buildings and infrastructure.

Quick Contact
Dilapidation Survey
Legal Protection
Detailed Records
Expert Assessment

Baseline Condition Documentation for Construction Sites

Dilapidation surveys document the visible structural and surface condition of buildings, roads, and surrounding assets prior to nearby construction or excavation works. The survey establishes a clear baseline record of cracks, defects, settlement, and surface conditions to mitigate risk and prevent future disputes.

These surveys are typically conducted before piling, deep excavation, demolition, heavy construction, or infrastructure upgrades.

Our Methodology

Delivering excellence through a proven three-stage workflow

1

Site Inspection & Visual Assessment

Systematic inspection of internal and external structural elements, facades, slabs, pavements, and adjacent infrastructure.

2

Photographic & Video Documentation

High-resolution photo and video recording of existing defects and surface conditions.

3

Condition Mapping & Reporting

Preparation of marked drawings identifying cracks, settlement, spalling, and other visible defects with descriptive annotations.

Applications

Industry sectors and use cases we serve

Pre-Excavation & Piling Works

Establishes baseline condition before ground disturbance

Adjacent Property Protection

Documents neighboring buildings prior to construction

Infrastructure Upgrades

Records road and pavement condition before heavy works begin

Dispute Mitigation & Legal Documentation

Provides evidence in case of structural damage claims

Deliverables

What you receive at the end of every project

  • Detailed dilapidation report
  • Crack and defect mapping drawings
  • Photographic documentation log
  • Annotated site plans
  • Video documentation (if required)
  • Summary condition assessment report
Deliverable example 1
Deliverable example 2
Deliverable example 3
Deliverable example 4

Technology Stack

Industry-leading equipment and software

High-Resolution Cameras equipment

High-Resolution Cameras

Advanced surveying technology for precision data capture and analysis.

Crack Width Gauges equipment

Crack Width Gauges

Advanced surveying technology for precision data capture and analysis.

Level & Plumb Instruments equipment

Level & Plumb Instruments

Advanced surveying technology for precision data capture and analysis.

AutoCAD equipment

AutoCAD

Advanced surveying technology for precision data capture and analysis.

Report Management Systems equipment

Report Management Systems

Advanced surveying technology for precision data capture and analysis.

FAQS

Frequently Asked Questions

Ideally before any construction activity begins on adjacent sites. Post-construction surveys should be done after works are complete for comparison.

Our reports are prepared to professional standards and are accepted as evidence in legal and insurance proceedings.

A single property typically takes 1-2 days for inspection and 3-5 days for report preparation, depending on size and complexity.

Yes, we document all accessible internal and external areas, including common areas, facades, basements, and roof areas.

Have more questions?

Our team of experts is ready to assist you with your specific project requirements across the GCC.

Send us a message